if we get water mor from 28 days to the rcc concret is this better or have a damag

Answer Posted / vasudev

right

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is dead load impact load live load

1360


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1392


how many time use of plywood shuttering and IS code

2684


what is diversion?

1737


How much cement,sand,bricks and water needed for 1square metre brick work?

1330






Explain what is 1/8 on the architect ruler denotes?

664


what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??

2626


What is a hatch patterns?

665


what is the weight of 12mm aggregates?

1086


HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?

1730


reinforcement slab, beam and column formulas?

2190


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

1693


How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?

2044


What are new methods /technologies of pothole patching?

1874


important question on stones

1512