if we get water mor from 28 days to the rcc concret is this better or have a damag
Answer Posted / vasudev
right
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
What is a hatch patterns?
what r you reqired for concrete baching plant?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
a butt weld is specified by
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
What is Curtailing of R/F
Volume of 25kg putty bag & 40 kg putty bag volume??
what is floating slab foundation?
Which ratio use for cement selery???
Doul Bar reinforcement and details of drawing.
Define What glue is least sticky?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
What is the effect of a building collapse?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete