i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?
Answers were Sorted based on User's Feedback
Answer / santosh singh
volume of cylinder = 22/7 x radius2 x height
this gives volume in cubic metres
multyply by 1000 to get volume in litres
if your dimensions are in feet convert it to metres
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / mandamalaki
22/7*12.5*12.5*7=3437.49 cft
convert cft in to cum
3437.49/35.314=97.34 cum
one cum = 1000lit
97.34*1000=97340 lit.
| Is This Answer Correct ? | 3 Yes | 0 No |
=3.14*12.5*12.5*7
=3434.3 cubic feet
=3434.3 *27
=92812.5 litres
| Is This Answer Correct ? | 4 Yes | 3 No |
Answer / mughalsab
22/7*d*d/4 x h then multiply with 28.316
note 1cft=28.316 liters
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / vikas p
Use Formula for cylinder volume=∏r2h = 3.14 X square(((25/2)/3.28)) X (7/3.28) = answer
value of pi ∏=3.14
Multiply the answer with 1000 you will get total volume of water in Ltrs.
| Is This Answer Correct ? | 1 Yes | 0 No |
To find volume
=22/7 * r *r*h
=22/7 * 12.5 *12.5*7
=3437.5 cubic feet
to convert into litres
= 3437.5 * 27
=92815.5 litres =93000litres
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / venkatesh
Dia of cylinder =25 feet
Height of cylinder=7 feet
Area of cylinder = 3.142*25*25/4=490.93
Volume of cylinder=490.93*7=3436.25 cft=97.3 cum
say 97311.7 lts
| Is This Answer Correct ? | 0 Yes | 0 No |
What is packing Factor ?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
what is the difference between rise and tread? what is its standered size? what is waist slab?what is the standered length of staire-case? also what is the angle between floor and landing?
how to calculate bearing capacity of soil
6 Answers L&T, Reliance, Sujala Infrastructure, TATA,
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
briefly describe your ideal job?
what is the minimum depth of cover required for pipes?
Sir how to find cutting length for footing steel bars in the shape of "u"
How much cum. Brick work can do by 1 madon
How to preparation billing for high rise building? anyhow can give the tips
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)