Key is put at the time of casting 1st lift of column to get–
–
Answer / sjtbehera
It gives a bond strength to 1st lift and 2nd lift column
| Is This Answer Correct ? | 1 Yes | 0 No |
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What is value of S.F at Point of contaflexure?
What is the differential length of steel reinforcement? What is the over lap length of steel in different grades of concrete?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
How much depth of excavation have to do for Highrised builldings?if Raft foundation how much,and Pile foundation how much?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
Define What is the force exerted by the Tacoma narrows bridge?
how you confirm the hard stratum for driven cat in situ pile work?
What are the alternate material for steel, Sand and aggregate
how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t
productivity of steel fitter per day
what is the grade of lean concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)