how much quantity of work we can get by rod benders per day
Answers were Sorted based on User's Feedback
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
# 1, What should be the Maximum Water observation of wood # 2. Is Alluminium is an alloy or not
how can we calculate the quantity of cement, sand, aggregate in any concrete mix
whats is difference between anchorage length and development length
Where hinge support is used in residential building?
How to fix toll charge for a particular vehicle at toll booths in a highway?
what is differences between ferrock and concrete ?
what is period of de-shuttering for different area of slab of M25 grade?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
Basic questions of civil engineering
0 Answers ONGC, RB Construction,
how can we determine the quantity of steel bars in a structure? is there any formula for determing the number of bars required ?
1m=3.281feet in that what is .281 mm cm m or anyother
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)