What is the stripping time of shuttering for PPC concrete
Answer / sjtbehera
What is mean by stripping. If you ,mean deshuttrring, then it wii 14 days to keep
| Is This Answer Correct ? | 0 Yes | 0 No |
what are the mixing of M10,M15,M20,M25,M30grades?
difference between deep and shallow well?
How much quantity water should be placed in one cubic meter area?
clean earthing and dirty earthing
1 Answers CSCEC-China State Construction Engineering Corporation,
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
what is mean by tremie concrete
What are the responsibilities of a site manager?
How to calculate the load of partion in flat slab if we use brick?
0 Answers CE, Mahalaxmi Developers,
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
Quantity of cement in kgs for different proportions and different thickness in plastering work per 1 sq.m. And how to estimate this quantities.
2 Answers Al-Jaber, IVRCL, L&T,
Types of Water Proofing Material?
what is the compressive strenth of m30 grade cocrete column at 7 days
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)