how many stones require for rr masonery work 1cum.
Answers were Sorted based on User's Feedback
Answer / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
| Is This Answer Correct ? | 24 Yes | 2 No |
state the functional requirement of a retaining wall
What is pre-stressed concrete?
Typical floor design load in Residential Building----------- -----
How can I calculate the Compressive strength of cubes after 28 days of curing?Is there any formula or ration ?
Define mirror?
How many times one TMT bars bents & straight upto not broken the bar.
What are the types of concrete
How much steel and concrit required in 1000 square feet slab?
What is Gsb tollens ?
apparatus of soundness test of cement
what is the development length formula as per concrete grade
why breadth of beam is shorter than (or equal to )its depth?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)