how many stones require for rr masonery work 1cum.
Answers were Sorted based on User's Feedback
Answer / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
| Is This Answer Correct ? | 24 Yes | 2 No |
what is the lap length
How much used for sand per square meter in 12mm Thickness
Should column area deducted from form work measurement of slab in building?
how many shuttering material required for 100 sqm
is their any instrument which can detect steel after casting of slab,etc. for verification of steel in slab,etc.
Name the standard sand for concrete tests
list out various type of codes:-
in m25 concrete what is m.
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
how many moisture content in well seasoned timber
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)