how many stones require for rr masonery work 1cum.
Answers were Sorted based on User's Feedback
Answer / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
| Is This Answer Correct ? | 24 Yes | 2 No |
what is the advantage of electronic theodolite over transit theodolite?
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
69 Answers Ashoka Distillers and Chemicals, ATS, Bajaj, Black Stone, Concor, CTM, Gaurav Constructions, HARIOM TMT, Indian Steel, IT Systems, IVRCL, L&T, MB, RCS, Sandhya Constructions, SCSVMV, Shree Cement, Shyam Group, SK, Student, Synfra, UltraTech, UPCL, URC Construction, vvip,
what is permissible IRC limits of silt content in river sand in India
What do we mean by partial moment release ??
Which is quantity of cement in 1 cu.m. concrete of M25 grade
What is the diff between cad & cadd?
Middle point of any slab is raised 10-12 mm during shuttering work because––
how many bricks are consumed for 01 Cum of brick work
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
When brick size is 3x5x9" , what would be the number of Brick requirement for 100 sqft area of 5" width?
beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.
Is there any alternate for plastering
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)