how many stones require for rr masonery work 1cum.

Answer Posted / santosh singh

For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work

Is This Answer Correct ?    24 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

1609


I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs

2055


How did street originate in the plumbing term street ell?

621


if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????

1803


How much quantity of rod binding work by a rod binder per day

847






How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....

1501


what is the exact dia of 8swg and 10swg gabion wire

1828


Define What is the origin of name Railway Sleepers?

809


How to do rate analysis for concrete work including shuttering work?

1545


hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

1397


WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

2085


why is the column design?

1820


What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.

1545


What is Rankine Cycle?

656


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1638