how many stones require for rr masonery work 1cum.
Answer Posted / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
| Is This Answer Correct ? | 24 Yes | 2 No |
Post New Answer View All Answers
How do you determine specific gravity of cement?
what is right & short method of measurement of slab&beam
What are the alternate material for steel, Sand and aggregate
Sir how to find cutting length for footing steel bars in the shape of "u"
it is a corrected question." make a list of engineering property(properties) of soil.
Draw the cross section of a boundary wall and label its part with detailing?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
For what purpose bedding is used under storm water drains?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
How do you prepare Material Recovery Statement for deduction from contractors bills?
How to find the cuplock pipe qty in staging for Minor bridge?
What are the different methods for drawing an arc?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
what is m30 in concrete tiles