which tests for concrete pouring period at the site?
Answers were Sorted based on User's Feedback
Answer / prashanth
only slump test at hte time of pouring the concrete.
| Is This Answer Correct ? | 9 Yes | 0 No |
Answer / rajnath rajbhar
Slump test
Sample collection (Cube)
Temp.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / utsav patel
slump test
and 2nd factor is temprature of concrete as well as temp of atmashphere...
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sjtbehera
Yes, slimp test, compaction test, cube test is after,
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate spacing rod in column
what is the stripping time of beam?
plz tell me max persantage of sand for every mix design by volume or weight.
How to find Weathering Course Material
WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?
where you provide on column
how to check the quality of concrete
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
material requred for 1 square foot lanter with formula
How to calculate the quantity for masonry(block and plaster)?
How can we calculate the cement Quantity in M25?
2 Answers JK Associates, Vardhman, Wave Infratech,
is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)