how much time will take for G+22 building for completion?
activity wise like excavation,sub
structure,superstructure,finishing,handover?
Answers were Sorted based on User's Feedback
Answer / mohammed shahid
Well, there are many factors the completion duration depends
on and a duration for the project of G+22 cannot be derived
and said to be so-and-so months, as not everything stays
ideal and as planned.
1. For Excavation - Area of the building and the depth and
also the type of earth we're excavating. (Hard rock takes a
longer duration than the soil)
2. Sub-structure - As you've mentioned it is a G+22, i'm
assuming there is no basement but usually a G+22 has
2basements. Hence as per your question and details provided
we're omitting the basements but still the area of the
building plays a major role and also the structural (RCC)
vertical members and the types of foundations. If it is a
raft foundation, it takes lesser time with say A number of
manpower and if its isolated footings with a few combined
footings with the same A number of manpower then the
duration might triple.
3.Superstructure - Depends on the area, the vertical
members, the depth of the beams, structural projections,
number of lift shafts and staircases. One suggestion here is
the "SLAB CYCLE" can be derived and the same an be
multiplied by 22 for the entire structural (RCC) work of the
building.
4.Finishing - The same concept of "SLAB CYCLE" can be
derived and multiplied by 22 for the finishing duration of
the building.
5.Handover - This shall include attending to the snagging
list of activities and rectification works if any. the same
can be considered as approximately 60days.
Still if the Interviewer demands for a duration at the end
of the above explanation (presuming he will not), you can
give him an approximate figure of 24months maximum.
| Is This Answer Correct ? | 5 Yes | 0 No |
how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum.
7 Answers Opera, Raheja, Star,
How to calculate the Water cement ratio of reqiured compressive Strength of concrete?
for mortar 1:18 how much cement and sand required for 1 CM
what is mean by bleeding of concrete
4 Answers Afcons, Habib Group,
How to calculate laplength for 3 floors
what ratio of cement and sand we used for making cover
What is meant by a context menu in a cad software?
What do you mean by bond? What are the different types of bonds?
What is the bar bending schedule
Define What are the uses of Groynes?
why compression strenth of concrete is tested with a cube of size 150x150x150 mm ?
how to laying tarfelt on asbestos roof for leeks water?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)