how much time will take for G+22 building for completion?
activity wise like excavation,sub
structure,superstructure,finishing,handover?
Answers were Sorted based on User's Feedback
Answer / mohammed shahid
Well, there are many factors the completion duration depends
on and a duration for the project of G+22 cannot be derived
and said to be so-and-so months, as not everything stays
ideal and as planned.
1. For Excavation - Area of the building and the depth and
also the type of earth we're excavating. (Hard rock takes a
longer duration than the soil)
2. Sub-structure - As you've mentioned it is a G+22, i'm
assuming there is no basement but usually a G+22 has
2basements. Hence as per your question and details provided
we're omitting the basements but still the area of the
building plays a major role and also the structural (RCC)
vertical members and the types of foundations. If it is a
raft foundation, it takes lesser time with say A number of
manpower and if its isolated footings with a few combined
footings with the same A number of manpower then the
duration might triple.
3.Superstructure - Depends on the area, the vertical
members, the depth of the beams, structural projections,
number of lift shafts and staircases. One suggestion here is
the "SLAB CYCLE" can be derived and the same an be
multiplied by 22 for the entire structural (RCC) work of the
building.
4.Finishing - The same concept of "SLAB CYCLE" can be
derived and multiplied by 22 for the finishing duration of
the building.
5.Handover - This shall include attending to the snagging
list of activities and rectification works if any. the same
can be considered as approximately 60days.
Still if the Interviewer demands for a duration at the end
of the above explanation (presuming he will not), you can
give him an approximate figure of 24months maximum.
| Is This Answer Correct ? | 5 Yes | 0 No |
what is hook's law
Engineering method, why need is column kiker??? what is necessity??
what the length we reduce for 45deg. bend for each side bend of bar.we know the 2d in case of 90 deg. bend.give clarification also?
Forces in a Shear Wall are in plane or out of plane ?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
0 Answers HR Construction, JP Group,
How should i calculate Cutting length of haunch bar in a raft including cover?
what is IS CODE in concrete tiles
residential projects,structural.
0 Answers Ambuja, KBR, Saudi Aramco Shell Refinery Company SASREF,
How much ratio of water in use of 1m.cube r.c.c the ratio is (1:2:4)
if we get water mor from 28 days to the rcc concret is this better or have a damag
I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?
What are the strongest shapes in building?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)