Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how much time will take for G+22 building for completion?
activity wise like excavation,sub
structure,superstructure,finishing,handover?

Answers were Sorted based on User's Feedback



how much time will take for G+22 building for completion? activity wise like excavation,sub stru..

Answer / mohammed shahid

Well, there are many factors the completion duration depends
on and a duration for the project of G+22 cannot be derived
and said to be so-and-so months, as not everything stays
ideal and as planned.

1. For Excavation - Area of the building and the depth and
also the type of earth we're excavating. (Hard rock takes a
longer duration than the soil)

2. Sub-structure - As you've mentioned it is a G+22, i'm
assuming there is no basement but usually a G+22 has
2basements. Hence as per your question and details provided
we're omitting the basements but still the area of the
building plays a major role and also the structural (RCC)
vertical members and the types of foundations. If it is a
raft foundation, it takes lesser time with say A number of
manpower and if its isolated footings with a few combined
footings with the same A number of manpower then the
duration might triple.

3.Superstructure - Depends on the area, the vertical
members, the depth of the beams, structural projections,
number of lift shafts and staircases. One suggestion here is
the "SLAB CYCLE" can be derived and the same an be
multiplied by 22 for the entire structural (RCC) work of the
building.

4.Finishing - The same concept of "SLAB CYCLE" can be
derived and multiplied by 22 for the finishing duration of
the building.

5.Handover - This shall include attending to the snagging
list of activities and rectification works if any. the same
can be considered as approximately 60days.

Still if the Interviewer demands for a duration at the end
of the above explanation (presuming he will not), you can
give him an approximate figure of 24months maximum.

Is This Answer Correct ?    5 Yes 0 No

how much time will take for G+22 building for completion? activity wise like excavation,sub stru..

Answer / prashanth kumar

within 30 months from the start date

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??

0 Answers  


compressive strength of country bricks in india

4 Answers   ATS,


Explain what is alternate bid?

0 Answers  


What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?

49 Answers   ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,


what is the difference between lap length & development length of reinforcement steel bars

1 Answers   APGenco, Consolidated Construction Consortium Limited,


how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?

2 Answers  


HOw to find the depth of foundation?

14 Answers  


Anyone have sample questions for bhel please send me since Iam appearing for this exam. Kindly send this to my e-mail: nethaj_babu@yahoo.co.in

4 Answers   Bhel,


What is the software used in civil engineering?

0 Answers  


how to calculate the number of cement bags required for 1m3 of work

4 Answers  


How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?

3 Answers  


how to calculate the required qantities of cement, Sand and aggrigate to prepare 1 Cum of concrete mix 1:2:4

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)