Engineering method, why need is column kiker??? what is necessity??
Answer / saquib hassan
kicker required to maintain proper verticality and column layout size.
| Is This Answer Correct ? | 0 Yes | 0 No |
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
any one tell me what is the volumetric ratio and weigh bathing ratio of 6000 psi concrete. plz help me on this matter.
What is the density of pcc considered in structure design for load calculation
what is the spacing required for chairs for reinforcing in raft footing.
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
what is the least count of Total station
what is the types of surveying?which type of survey carrying for type of work?
Isolated square footing quantity calculations
what is fe 415 steel
15 Answers L&T, Nabard, Rahul Computers,
father of soil mechanics
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
How to calculated +ve & -ve Bending moment coefficient in water tank design for design of side walls.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)