how much time will take for G+22 building for completion?
activity wise like excavation,sub
structure,superstructure,finishing,handover?

Answer Posted / prashanth kumar

within 30 months from the start date

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many bricks are there in 100cft?

828


What is the tensile strength of wood?

644


What is Refuse Area In High Rise Building ?

1485


What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4641


five requirements of infill panels for walls?

3268






can you provide a link for manual design of building?

1116


How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

3685


what pressure the NP2 class RCC pipe can sustain?

2203


plumbing CPVC fitting FTE Brass full form

2123


Can inverted beams used in pipes during construction?

862


How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?

2038


What is rate of concrete surface rendering work per sqm

1422


how to do cementicious paint for rcc walls of cw pump house

1531


Explain what is Critical Path Method (C.P.M)?

663


Slump Values for works?

1752