how much time will take for G+22 building for completion?
activity wise like excavation,sub
structure,superstructure,finishing,handover?
Answer Posted / prashanth kumar
within 30 months from the start date
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
how many type of admixtures for water stored structure?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
what is the percentage of silt in black cotton soil.?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
how many digree of freedom in four bar chain
Explain moment of inertia?
What is the distance between railway tracks?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
For the construction project what capital cost has to be taken in consideration?
how can we calculate steel value, depending on load
What is change order request?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.