how much time will take for G+22 building for completion?
activity wise like excavation,sub
structure,superstructure,finishing,handover?
Answer Posted / prashanth kumar
within 30 months from the start date
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
How many bricks are there in 100cft?
What is the tensile strength of wood?
What is Refuse Area In High Rise Building ?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
five requirements of infill panels for walls?
can you provide a link for manual design of building?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
what pressure the NP2 class RCC pipe can sustain?
plumbing CPVC fitting FTE Brass full form
Can inverted beams used in pipes during construction?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
What is rate of concrete surface rendering work per sqm
how to do cementicious paint for rcc walls of cw pump house
Explain what is Critical Path Method (C.P.M)?
Slump Values for works?