How should i calculate Cutting length of haunch bar in a raft including cover?
Answers were Sorted based on User's Feedback
Answer / er rajkumar
it s deponding on heigt of hans bayr for ex. heigt 300 lenght 400 then 500 ans
300+400+500=1200
and hook 50+50=100
=1300
| Is This Answer Correct ? | 5 Yes | 32 No |
how many bricks are requir for one unit ho we will caculate
Plz tell me...column and wall section drawing.
How much sand for a 107sqm residensial building
1 Answers Shapoorji Pallonji Group(SPCL),
What is portland cement
what is the used civil engg?
Though Column is a compression member and concrete takes compression, why we use steel at column ?
How much overlapping required for welding the reinforcement bars in Columns & beams
what is coping?
11 Answers GKC Projects Limited GKCPL, Technical Construction, Vijai Electricals,
what are the questions that will be asked in interview in civil engineering
what will be the difference in compressive test results for a 150 mm cube, a 150 mm cylinder and a 300 mm cube
what is cement mortar cube size and strength in 3days, 7days and 28days
why red bricks used for brickbat coba
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)