Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is IS CODE in concrete tiles

Answers were Sorted based on User's Feedback



what is IS CODE in concrete tiles..

Answer / silpa

IS 1237-1990 FOR Tiles(Concrete)

Is This Answer Correct ?    6 Yes 1 No

what is IS CODE in concrete tiles..

Answer / mr.ravichandran

IS 456

Is This Answer Correct ?    10 Yes 6 No

what is IS CODE in concrete tiles..

Answer / shreekantabehera2@gmail.c

IS 1237-2012 for concrete tiles

Is This Answer Correct ?    0 Yes 0 No

what is IS CODE in concrete tiles..

Answer / royal civilian

IS 516

Is This Answer Correct ?    2 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate steel in slabs ?

1 Answers   Lodha, NCCL,


what is the concrete mix design ratio of railway sleeper??????

1 Answers   DSC,


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

0 Answers  


yasser arfatcompleted his degree in civil from which university

0 Answers  


What is the difference between Stress & Strain?

2 Answers   NCC,


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

0 Answers  


need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS

0 Answers  


Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??

0 Answers  


Did you handle any interior designing jobs?

5 Answers   Shell,


Quality of first class bricks

4 Answers   HPCL,


What is a kip?

0 Answers  


A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)