why construction joint in
the slab should be l/3 of
span? what's the technical
reason for that?

Answer Posted / deepak katyal

Construction joints have been provided at 1/3 point of span
on the basis that moment is least there.

Is This Answer Correct ?    20 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

1785


what are RIB slabs explain about it

2179


Where will be the maximum bending moment in a TEE Beam?

6532


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2732


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1910






How to come 1.54 from dry to wet concrete? 

1813


115mm thickness brick work how to required mortar

1626


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

940


HOw much % of premium on DSR-2013 currently

1530


IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

1584


please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering

1056


For what building Built-on balconies are preferable? What are the advantages?

714


what is the water-cement ratio of mix design while 30mpa in 7 days?

2626


define the strength

1689


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

1659