What is the ratio of cement ,sand, and aggregate to be used
in M20 grade of concrete when excavating 200 x 200 x 200 mm
of sand from soil
Answers were Sorted based on User's Feedback
Answer / swrytery
1:1.5:3
1 part of cement
1.5 part of sand
and 3 parts of broken stones
Is This Answer Correct ? | 19 Yes | 2 No |
Answer / sjtbehera
i do not understand your question. In is code M20=
1:1/1/2:3.
what means when excavating 200mmx200mmx200mm in sand soil.
either your question releated to bearing capcity of soil
or strength of sand or what is the minimum dstrength
recquired in sand soil. explain
Is This Answer Correct ? | 9 Yes | 1 No |
What are the different types of runners?
what is FPS brick
What are the tests to be conducted on cement?
what is the multiplying factor for diffrent types of pcc/rcc ratios?
How to take cutting length of Stirrups when 10 leg has given Size is 1200x1200
how many digree of freedom in four bar chain
How we decide the type of footing?
what is the full form of GGBS?
how much extra rod length should be provided for beam
What are the different types of pile founations used?
what is the average steel consumption in multy storey building as a residential and commercial?
percentage of wastage limits in construction materials EX : min & max . cement = fine aggregate = coarse aggregate = admixture = wood = tiles = painting = marbles = bricks =