Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the rating of your capacitor bank at your company.

Answers were Sorted based on User's Feedback



What is the rating of your capacitor bank at your company...

Answer / sisir kumar singh

the general principle of installing capacitor bank is
take 35% of the connected load.and in a capacitor bank put 12 -15% as a fixed capacitor.
suppose your connected load is 1000 kw then the capacitor bank size will be 350 kvar and the fixed capacitor will be12-15% of 350 kvar that is 42 -53 kvar

Is This Answer Correct ?    3 Yes 0 No

What is the rating of your capacitor bank at your company...

Answer / parag

750kvar

Is This Answer Correct ?    8 Yes 6 No

What is the rating of your capacitor bank at your company...

Answer / aakash

depended on company load

Is This Answer Correct ?    2 Yes 0 No

What is the rating of your capacitor bank at your company...

Answer / sandeep sharma

-Depend on the load ....

Is This Answer Correct ?    2 Yes 0 No

What is the rating of your capacitor bank at your company...

Answer / amanpreet singh

240V to 2490V and size of 2.5kvar to 1000kvar

Is This Answer Correct ?    7 Yes 6 No

What is the rating of your capacitor bank at your company...

Answer / manjunath.m

Maximum we can connect the capacitor bank 40% of the
contract demend.
EX: our Bescom contract demand is 1000 kvar.
we can connect up to 400kvar capacitor bank panel.

Is This Answer Correct ?    3 Yes 2 No

What is the rating of your capacitor bank at your company...

Answer / kg

50 and 100kvar

Is This Answer Correct ?    1 Yes 0 No

What is the rating of your capacitor bank at your company...

Answer / md.nur nabi hossain

for 11kv , capacitor bank will be1500kvar.

Is This Answer Correct ?    1 Yes 0 No

What is the rating of your capacitor bank at your company...

Answer / suresh kumar

The capacitor maintained current load and the power ffactor 0.91 to 0.99 is correct values of capacitors in ac supply and DG set of pf is 0.85

Is This Answer Correct ?    1 Yes 0 No

What is the rating of your capacitor bank at your company...

Answer / shubhanshu

in my company we have installed two capacitor banks of 3.242 MVAR to improve the power factor.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how to calculate cable size, olr rating, contactor rating and mccb rating,to below given details three phase motor 75 kw,415 v,.85 pf,50 hz?

5 Answers   Cabin Crew, Essar,


what are the functions of fuse ?

1 Answers  


What’s electric traction?

0 Answers  


how to reverse the direction of universal motor?

2 Answers   Finolex, JGT, TATA,


explain the application of reciprocity theorom

0 Answers  


how to calculate short circuit breaking capacity KA for 2500kva 33kv transformer.

0 Answers  


We have energy meter of ct ratio 200/5amp and installed cut having ct ratio 100/5 amp what is final MF?

2 Answers  


in my industry we are using 3 step up transformers for induction heaters..i.e 415/580v and other are 11/440v.in power consumption does a step trnsformer makes any difference compared to step up?? plz explain

0 Answers  


What will be the size of cable required for 5.5 KW motor ( Full load current 10 Amps approx.), Starting current with DOL is 120 Amps. Aprrox. Short circuit current with LLLG fault is 2000 Amps Approx.

2 Answers  


We are getting supply at33kvand it stepdown to 11kv.So Our requirement is 11kv voltage.why we draw 33kv from the grid instead of 11kv?

2 Answers   Birla,


for high freq ac,why we first convert AC to DC and then DC to high freq.AC

0 Answers  


what is buffer resistance starter.?.What is the working principle and where it is used..?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)