11 kv metering is done in my factory.Meter show PF 1.000
but kvarh lag&lead show 24&94 respectively & Avg.PF
is .956 .? is what i do for inproove my PF to 1.000

Answers were Sorted based on User's Feedback



11 kv metering is done in my factory.Meter show PF 1.000 but kvarh lag&lead show 24&94 res..

Answer / vinit patil

Your Meter reads Power factor at load center. In your case
load center might be far away from your tariff meter. Since
your APFC meter shows PF 1.00 but at your tariff meter on
11 KV side p.f still lagging. This happens because of
transformer inductance. Add 10 % KVAR of transformer
capacity directly in ON position. Your problem will go out.

Is This Answer Correct ?    2 Yes 0 No

11 kv metering is done in my factory.Meter show PF 1.000 but kvarh lag&lead show 24&94 res..

Answer / prasad

If your metering cubicle is showing PF as unity then what
is the problem?

Is This Answer Correct ?    0 Yes 1 No

11 kv metering is done in my factory.Meter show PF 1.000 but kvarh lag&lead show 24&94 res..

Answer / arvind

it is very difficult to achive 1 power factor because it
depends on the load. as u said it is 0.956, then it is good
that power factor is almost to 1.

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

I AM INTERESTED TO WIND A 3 PHASE MOTOR HOW I CALCULATE TURNS, PITCH,AND WIRE SIZE FROM STATOR DIMENTIONS

0 Answers  


why r we using vaccuum circuit breakers in the place of m.o.c.b.

1 Answers  


what the effect will occur if we increase the airgap in induction motor

3 Answers   ONGC,


What is the one main difference between ups & inverter ? And electrical engineering & electronics engineering ?

0 Answers  


how to calculate overall efficiency of diesel generator set? give us a formula with an example.

2 Answers  






How can we get d.c series motor characteristics by using a.c induction motor?

1 Answers   IIT,


explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)

6 Answers   TNEB Tamil Nadu Electricity Board, wbsedcl,


What is the operational principle of direct current current transformer and direct current potential transformer?if possible plz reply with ckt. diagram.

1 Answers  


if 12v battery get discharged for 2 months after if we put charge it will charge again?how much time it will take to charge?

0 Answers  


What safety precaution are to be taken for avoiding electric hazards ?

0 Answers  


What is the reason behind 11kv 33kv 132kv.....means multiple of 11?

6 Answers  


why using touble tube lamp use in factory?

3 Answers   ONGC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)