In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
Answer / sjtbehera
one after another is not a big thing. one mould cam complete
in 3 minutes. that is not big diffidence in strength
Is This Answer Correct ? | 1 Yes | 0 No |
I am constructing a house having 20' X 19' hall. Do I need to go for a concealed beam. any alternative please? Thanks if a design is provided.
how to calculate quantities of sand , cement & aggregate in 1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of 10cm brick wall, paint quantity for 1m2 snowcem and lime painting?
3 Answers DCPL, EverSun, Pace Power Systems, Sobha Developers,
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
A lorry contains 3-Units of material(Sand/Metal/Gravel...) so 3-Units means how many (CFT and M3)
What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
1 Answers AKM Construction Management,
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
Types of Water Proofing Material?
the moisture content of the soil below which the soil volume becomes constant ie called liquid limit plastic limlt shrinkage limit none
Why you are leaving present job?
WHY DID YOU CHOOSE THIS CARRIER?
Why the name is "partial safety factor" why not "safety factor"?
0 Answers Engineers India Limited,
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.