In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
Answer / sjtbehera
one after another is not a big thing. one mould cam complete
in 3 minutes. that is not big diffidence in strength
| Is This Answer Correct ? | 1 Yes | 0 No |
How to calculate the quantity of ingredients of M20 grade concrete?
How many steel is require in one cubic meter area?
.5Ast
what is ment by surveying?
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 + 1 + 1 x 0 = answer??? pzl tell the rite answer ??
how to find no bar in 1 length
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
What is packing Factor ?
how the sand fail?
Brick work how many days curing and at any concreting pl
9*9m 1:4:8 ratio using what quantity of 40mm aggregate, sand&cement please tell anwser
Slump Values for works?
1 Answers Aditya Constructions, SVS Constructions,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)