What is packing Factor ?
No Answer is Posted For this Question
Be the First to Post Answer
Cost control in civil construction as well as Quality control
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
where can i get the previous question papers for rrb section enginerr (civil)
what pressure the NP2 class RCC pipe can sustain?
what is the difference between compaction and consolidation?
ratio of sand, cement and metal in all concrete mix
silt%= silt volume/ silt+sand volume is this right?
what is plum & mass concrete?
suppose we have a tendency to make a hole on the surface of the beam, than where we goes to make it?
what is mean by shear resistance in concrete?
3 Answers CCCL, Noble Consolidated Glazings, Sobha Developers,
material calculations for I st coatplastering 16mm CM (1:5),second coat CM(1;3)4mm thick,pcc(1:4:8),RCC M20,lime stone masonry CM(1:6)
Civil engineering related
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)