What is packing Factor ?
No Answer is Posted For this Question
Be the First to Post Answer
How are freeway bridges built?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
how to calculate MR 9(derivation)
How to design staircase.plz tell me formula for the design the staircase.
what is the criteria for the finalisation of pavement thickness in road project?
What is the proportion of M30 to M80and which construction these are used
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
what is cement mortar cube size and strength in 3days, 7days and 28days
Special thing in designing a overhead reservoir ? which is different from an ordinary design
What is the use of array command?
12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
satart to end steps by step process of building construction...? i want to planning theme accuretly
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)