In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
Answer Posted / sjtbehera
one after another is not a big thing. one mould cam complete
in 3 minutes. that is not big diffidence in strength
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how much cost of single coat 20mm thick plastering per sqre meter
how to calculate MR 9(derivation)
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
what is right & short method of measurement of slab&beam
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
Formula of area of crane hook
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
what is tension & compression of steel bending.
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
What is geopolymer based concrete?
How to take labor charges for construction of 1cum of concrete?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)