How we can calculate the quantity of sand, & cement, & also
aggregate for a slab.
Length 25'/3.28 = 7.62 Mtr
width 20'/3.28 = 6.09 Mtr
depth 6" /3.28 = 0.152 Mtr
Answers were Sorted based on User's Feedback
Answer / pravinkumar .a.thakor
slab in m-200 cc
7.05 cmt
sand- 2.679cmt
cement- 77 bags
aggregate- 5.358cmt....
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / selvam.m
First off thank to all ans poster.
Qty Of the Slab is = 7.62X6.09x0.152
= 7.054 Cum
Assume we providing the M20-Concrete on this slab.
Cement:
cement = 7.054*300 = 2116.1kg
or
Cement + Fly ash = 7.054*270 + 7.054*56 = 1904.5 kg cement,395kg fly ash.
Sand:
Sand = 7.054*120*6 = 5078.88 kg.
Aggregate:
20mm= 7.054*126*6 = 5332.824 kg.
12.5mm = 7.054*6 = 3216.624 kg.
Note:
M20-concrete
1Bag - Cement
120kg - sand
126kg - 20mm Agg
76kg - 12.5mm Agg
water - 25 ltr
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the difference between prime coat and tack coat in road construction
convert area- 1 war = meter, 1 guntha = meter
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
use ofr concrete as per grade ?
how much shuttering oil required for 100 sqm shuttering?
what is the exact dia of 8swg and 10swg gabion wire
TELL ME THE EQUATION FOR OGEE SPILLWAY
What are the types of Road in India?
explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting
what type offoundation suitable for clayey type soil
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
minimum dia of manhole cover should be A] 50 cm B ] 100 cm C ] 75 cm
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)