How we can calculate the quantity of sand, & cement, & also
aggregate for a slab.
Length 25'/3.28 = 7.62 Mtr
width 20'/3.28 = 6.09 Mtr
depth 6" /3.28 = 0.152 Mtr
Answers were Sorted based on User's Feedback
Answer / pravinkumar .a.thakor
slab in m-200 cc
7.05 cmt
sand- 2.679cmt
cement- 77 bags
aggregate- 5.358cmt....
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / selvam.m
First off thank to all ans poster.
Qty Of the Slab is = 7.62X6.09x0.152
= 7.054 Cum
Assume we providing the M20-Concrete on this slab.
Cement:
cement = 7.054*300 = 2116.1kg
or
Cement + Fly ash = 7.054*270 + 7.054*56 = 1904.5 kg cement,395kg fly ash.
Sand:
Sand = 7.054*120*6 = 5078.88 kg.
Aggregate:
20mm= 7.054*126*6 = 5332.824 kg.
12.5mm = 7.054*6 = 3216.624 kg.
Note:
M20-concrete
1Bag - Cement
120kg - sand
126kg - 20mm Agg
76kg - 12.5mm Agg
water - 25 ltr
Is This Answer Correct ? | 0 Yes | 0 No |
What is ld in beams column and slab.
what is bending moment?
what is meant by concrete joints?
please send me bhel questions on rupesh.017@rediffmail.com
what will be the cost of constructing a plinth of (40x40x4)ft and a PCC layer of 4 inches?
which Indian standerd code is used for billing
4 Answers Desai Construction, DLF, NKG Infrastructure,
how much cement sand n bricks required in im3?and how much in plaster?
what do u mean by elongation & flakiness of aggregate?
Concrete how muvh strenght gain 7days,14day,s,21day's,28day's&56day's after curing
How many square meter can a worker/labor demolish a structure per day?
How many no of bars in a bundle of steel and kgs/bundle. 8 mm, 10mm, 12mm, 16mm, 20mm with both MS and TMT separate.
what is lap length? why it is required?