How to calculate numbers of carpenter, fitter, mason, unskilled worker on
the basis of built up area or floor plat area of building?

Answer Posted / prasanth

work done/per day

Is This Answer Correct ?    3 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1411


if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.

728


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

1573


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

1610


how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

1878






Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1817


What is a kip?

712


what is the minimum compressive strength of clay brick

1754


What out turn civil works

6341


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

661


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

1769


Explain what is Critical Path Method (C.P.M)?

669


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

2387


The 4 main factors to start a construction project are––

1784


What is the origin of name railway sleepers?

838