How to calculate numbers of carpenter, fitter, mason, unskilled worker on
the basis of built up area or floor plat area of building?
Post New Answer View All Answers
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
What is a kip?
what is the minimum compressive strength of clay brick
What out turn civil works
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
Explain what is Critical Path Method (C.P.M)?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
The 4 main factors to start a construction project are––
What is the origin of name railway sleepers?