How to calculate numbers of carpenter, fitter, mason, unskilled worker on
the basis of built up area or floor plat area of building?
Answer Posted / osama haggag
Quantity of works/production rate of one worker
production rate = work done/time
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
What is the procedure of concealed plumbing in toilets?
what is the price of a cubic meter of concrete on international market?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
Why is the statue of liberty made of copper?
Why should pumping be not used in case of concreting work?
Where will be the maximum bending moment in a TEE Beam?
what is work of planning deptt. in any construction compny (in road project)
what is the criteria for the finalisation of pavement thickness in road project?
what is tension footing?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
why we are useing plastic under the lean concrete?and whts the advantage?