Answer / pradeep
There are so many testing are available to test a power transformer.
1. Turns ration testing : to ensure the no.of turns on each winding.
2. Winding resistance testing: To measure the resistance of each winding.
3. Vector group testing : To identify transformer vector group, which is very important for parallel operation.
4. Insulation resistance testing : To ensure the healthiness of transformer insulation resistance.
5. Impedance voltage testing : Important for parallel operation and loading condition assessment.
6. No load/ Short circuit testing : For the measurement of losses.
7. Partial discharge testing : To monitor the insulation imperfection/aging effect
8. Switching impulse/ lightning impulse testing : To measure the impulse withstand strength of the transformers.
9. Acoustic level measurement: To track the level of magnetic hum of the transformer.
10. Dissolved gas analysis: To identify dissolved gaseous in the transformer gases.
11. Dielectric testing : To measure break down potential of transformer oil.
And the count goes on...!!!
The type of testings carried out will vary based on the application and criticality
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sudhakar g
HI,
Power transformer is used in Switchyards where it can
supply the voltage from grid to grid and the strutcure of
the transformer is Delta to Delta connection. there is no
stepup or step down in that.
I am taking Electrical desining classes in Bangalore...It
will be usefull for designing as well as site engineers
those who are intrested to go for Electrical
Engineers....we give you indepth knowledge of Load calu,
Cable sizing, Lighting cal, panels, breaker
selection,Autocad drawing....if any body intrested means
pls call to +91-7760362623 or sudhakar28485@gmail.com
| Is This Answer Correct ? | 1 Yes | 2 No |
Why two nos. un-tensioned wires are placed inside the PSC poles used by powergrid in RGGVY works.
I WANT HOW CALCULATE TO CABLE FOR WELDING PLANT ?
Is it possible to implement Restricted Earth Fault protection for a transformer without neutral CT?
what is formula of illumation calculation
what is creepage distance
can any one help me out by posting something related to rvnl interview for site engineer electrical.? what is the procedure? what kinda question they ask us? how long the interview goes? and any tips? and any thing you want to share?
if any one phase of the 11kv/415v distribution transformer not delivering the supply voltage what will happen
what is hystersis loss?
i purchase a microwave which is 50/60Hz but Current Setting 60Hz in my country we usually use 50hz, can i use AVR to solve my problem?
why do we require two lines one phase and a neutral for an ac transmission..is neutral potential zero..?if yes y carry a neutral line from generating station itself...why dont we take it from ground
What are the types of transformers according to the arrangement of iron cores?
I have 2 Nos of 2500kVA 33/0.415V cast resin transformers. How to decide on ampere rating of HT Panel? Also advise me how many panel RMG i have to consider whether 4 panel ok?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)