Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


In 1000KVA Transformer why does we connect HT with delta
connection and LT with star connection.Illustrate by showing
formula?

Answers were Sorted based on User's Feedback



In 1000KVA Transformer why does we connect HT with delta connection and LT with star connection.Ill..

Answer / guest

Stepdown transformer(HT/LT) generaly used for distribution purpose so secondary side star is necessary and to increase voltage ratio primary side delta is necessary ie. in delta we get line voltage which is 1.732 time of phase voltage (star voltag) therefore less turn required in secondary side.

Is This Answer Correct ?    12 Yes 1 No

In 1000KVA Transformer why does we connect HT with delta connection and LT with star connection.Ill..

Answer / siddhartha agrawal

Generally HT side there is only three phase available while
LT side we require neutral. So we connect LT side Star
connection to use phase to phase voltage (415 volt) and
phase to neutral voltage- single phase load (240-220volt).

Generally HT side there is only 3 wire to reduce the cost of
transmission wire cost.

Is This Answer Correct ?    8 Yes 1 No

In 1000KVA Transformer why does we connect HT with delta connection and LT with star connection.Ill..

Answer / ap

we use delta connection in primary side (HT side) because if any fault current occurs it circulates in primary only and is not transmitted to secondary. Thus secondary is free of fault current.

Is This Answer Correct ?    4 Yes 0 No

In 1000KVA Transformer why does we connect HT with delta connection and LT with star connection.Ill..

Answer / bikki

In HT transformer, the primary side has less voltage stress since it is a step up transformer. But the voltage on secondary side will be high and hence the stress will be also high.As a result, the winding insulation requirement will cost a lot if the connection was Delta on secondary side;because in delta phase voltage=line voltage.
But if the secondary connection is star, then phase voltage will be Line voltage/(sqrt(3) which means the winding has to withstand less voltage stress and hence less insulation is required.Hence lesser cost.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what type of motor used to move a 1 ton gate? and relate ratings with load.

0 Answers   Khidmah,


Why not LED burn after showing alarm,as Alarm volt is 11- 13,But LED is of3 volt,why it isnt Burn??

1 Answers  


any one have papers of hpcl or sailof ELECTRICAL ENGG.

1 Answers  


what does work of electrical technician in industrial

1 Answers  


Why DG self motor winding burnt out?

1 Answers   Aegis,


how does induction motors works.

1 Answers  


according to faraday's law whether the induced emf is average or rms value?

2 Answers   Power Grid,


what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?

0 Answers   Siemens,


can wind-turbine effect on rain or on cloud's

1 Answers  


Type of cable insulation?

3 Answers   Essar,


what is electricity

4 Answers  


ELECTRICAL MACHINE

2 Answers   Bhel, HPC, NHPC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)