If we tell 60 sq.mm. 3-1/2 core cable,then what does it mean
?
1) Each core section in the whole cable is of 60 sq. mm.
2) The whole cable is of 60 sq. mm. which is sub-divided
into 3-1/2 core.
Answers were Sorted based on User's Feedback
Answer / siddhartha agrawal
3-1/2 core cable having 4 section (R,Y,B,N)
R,Y,B having the 60 sq mm conductor section while neutral
having the half of the 60 sq mm (approx 30 sq mm ) section.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / binod
3cores are 60 sq.mm & 1/2 is less than 60 sq.mm this type
of specification is meant for cable size(3phase and one
neutral)
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pradyumna chandra panda
There no such size(60sqmm)of cable available. Yes 70sqmm size cable. Size means cross-section area(pi D sq /4) of individual core of a cable. Three and half means, same size of three cable (RYB) aod nutral core is approximately half size of other.
| Is This Answer Correct ? | 0 Yes | 0 No |
What is required of exietation to the alternater.
cable tray sizing & selection
how to reduce power loss when the tranmission under long distance?
what is power frequency withstand and impulse withstand of a circuit breaker?
what are the duties of commutator in motor and generator?
what is the basic difference between fan and home motor if both have single phase induction motor?
4 Answers Engineers India Limited,
Differentiate between Zero and Negative sequence current
i applied for the ap transco please forward the freqventley asked QA
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
hi frds, i m electrical engineer.can i get cdr for electrical engineer if u have then send me on my mail id its jayesh_ee88@yahoo.com.please help me frds
Wtat is mean by GHOAST VOLTAGE?
Why we Specify Transformer rating 433 V Instead of 415V ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)