Even when a particular generator in a generating station is
under maintenance we are still able to maintain the same
power output. How is this possible? Does the tie line
between 2 generating stations have a role to play in it?
It must be noted that installed capacity of a power plant
is always designed to be greater than the load demand.Hence
if any repair or maintaince remaining all are in operation.
If no reserve capacity of plant then tie line has a role to
play.Tie line is line connecting two generating station
buses.Hence required power in one plant is obtained from
reseve capacity of other plant.
Is This Answer Correct ? | 7 Yes | 1 No |
i have 60Hz motor, can i run it at 50Hz power supply ???
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
Why the electron flow in reverse of current.
Why ACB is used in LT why not in HT and why VCB is used in HT why not in LT
Explain what happens to the speed of a series motor as the load decreases
Why DC current is not used in transformer?
WHAT IS THE DG OIL SPECIFICATIONS AND WHAT IS THE DIFFERENCE BETWEEN THE DG OIL AND TRANSFORMER OIL
how to calculate efficiency of voltage and current controlled welding transformer?
why we use 25 kv in railway .not 11kv, or 33 kv
what is transformer tap change HT side and LT side
what is safety measures of alternator.
10 Answers HP, MNC,
why impudance relay used for medium transmission power system? why not others?