What will happen if induction motor is supplied with
capacitive load?
It is quite clear that Poor load current phase angle is
generally the result of an inductive load such as an
induction motor, power transformer, lighting ballasts,
welder etc.
Specifically discussing the case of induction motor we often
use the bank of capacitor to improve the power factor. If
the motor is already being supplied by capacitive load then
it may be fruitful for the motor as well as for the whole
system but up-to some extent. The power factor on capacitive
side has also its own draw backs. The major is to increase
the thermal losses.
| Is This Answer Correct ? | 1 Yes | 0 No |
what is MULTIPLYING FACTOR in substations??
What is the transfer function?
If there is major % of Voltage harmonics in the system, how can it be control or reduced?
WHAT IS THE MEANING OG (li = 7 In)
On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.
Why insulation level follows this order? transformer < bus bar < circuit breaker & Isolator < transmission line.
how to reduce the power consumption in office ?
What is the difference between Earthing & grounding
What is the selection & Designing procedure for DG/Transformer
4 Answers Crompton Greaves, Sterling, TATA,
which will glow brighter?bulb 1 (110v,100w) and bulb 2 (230v.200w) series connection
What Is the Difference Between Lightening Spike and Lightening Arrester?
In scott connection why connect teaser transformer to 86.6% and main transformer to 50%..
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)