how we control the temperature during concreting ?
Answers were Sorted based on User's Feedback
Answer / manu
1. by using under ground water in hot whether
2. by steam curing, in cold whether
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / arvindrai
1))By providing temperature bars in concreting section
2)) Providing of Ice pieces at time of mixing
| Is This Answer Correct ? | 8 Yes | 2 No |
Answer / sjtbehera
ok we are going to mix admixture for that, but if our
concrete mixer is place near by we can handle this. main
cause of higher temp. is water evapouration. i saw mixing
of ice for that.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / abinash chandra giri
During concrete in case of
normal weather condition
we must used underground
water/drinking water.if hot
weather condition we must
used ice but we should
follows the is 7861.in cold
season we must used hot
water.
| Is This Answer Correct ? | 0 Yes | 0 No |
one cubic meter of concrete contains how much proportions of cement,sand and course aggregate
6 Answers AB Inc, APPSC, Arif Builders, Ramky, SMEC,
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
how can economic during construction of a project.
How much does it cost for a R.C.C roof slab of size (25 X 20) given in feets using 1:2:4 concrete mix of M20?
HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm
Which is the direction for positive angle?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
different types of footing. and difference between footing and foundation
what is the list of building construction equipment & teir output?
how to calculate the steel for 450 sft slab, please tell me the solution method
How much material will consume for following specification water tank (9*7.5*6 feet)?
Diagonal check is required for a layout work to confirm ––
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)