Answer Posted / arvindrai
1))By providing temperature bars in concreting section
2)) Providing of Ice pieces at time of mixing
Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
Explain what is alternate bid?
Which are the Steel tests ?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What are the different theories of failure under static load?
What is Architect-Prepared Contract?
why demand factor less then 1 ?
Explain creep?
what do you understand by M25 concrete
Define Workability ?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
How do you calculate the power of centrifugal pump?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
The mixture of different ingredients of cement is burnt at?