Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how we control the temperature during concreting ?

Answer Posted / abinash chandra giri

During concrete in case of
normal weather condition
we must used underground
water/drinking water.if hot
weather condition we must
used ice but we should
follows the is 7861.in cold
season we must used hot
water.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Grid floor and mention its advantages ?

3193


how many litres of enamel paint required for 5000 sft of site?? 

1872


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1803


what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete

4250


how to caluclate sienerge qty in construction in ap

2361


what are the types of dimensioning?

2211


For what building Built-on balconies are preferable? What are the advantages?

1174


Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet

2791


What you understand by richter scale?

1154


where i can get material costs on weekly basis

2110


What is the standard volume of pharma in cub ft

1698


Cement consumption of one cubic meter of aerocon blocks masonry?

4061


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

5012


what is the Asfalt test?in road constraction..?

2058


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2395