Answer Posted / sjtbehera
ok we are going to mix admixture for that, but if our
concrete mixer is place near by we can handle this. main
cause of higher temp. is water evapouration. i saw mixing
of ice for that.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Difference between pre-tensioning and post-tensioning.
How to take labor charges for construction of 1cum of concrete?
What is OSHA compliance?
How much is the cover for slab?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
what is the breaking strength of wall tiles
How to do rate analysis for concrete work including shuttering work?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
How to design staircase.plz tell me formula for the design the staircase.
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
What are the composition of a landfill?