how we control the temperature during concreting ?

Answer Posted / sjtbehera

ok we are going to mix admixture for that, but if our
concrete mixer is place near by we can handle this. main
cause of higher temp. is water evapouration. i saw mixing
of ice for that.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1392


List out some of the common problems that architect have to tackle it?

632


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

1578


What does civil status mean?

677


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

1863






reinforcement slab, beam and column formulas?

2190


What is the usage of zoom command?

678


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1411


i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

11527


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

2767


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

1947


TELL ME THE EQUATION FOR OGEE SPILLWAY

2166


Why we provide hair pin for shed

1910


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

1689


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2306