What is the difference between EPC,DBOOT and BOOT.
Answers were Sorted based on User's Feedback
Answer / nkn
These are the terms used in contracts, EPC - Engineering ,
Procurement , Construction; BOOT- build Own Operate
Transfer; DBOOT - Design Build Own Operate Transfer.
| Is This Answer Correct ? | 22 Yes | 3 No |
In the EPC system, funds will be provided by the client
based on the client's estimation.The contractor has to
execute the project as per the scope of the client. In the
BOOT, the funds shall be of contractor's and based on
project viability, the contractor can collect fee from the
users for a specified period to get back his funds.
Wherein, the designs will be specified by the client. In
the DBOOT, contactor can do value engineering based on the
scope of the project and can get back his investment as in
the case of BOOT.
| Is This Answer Correct ? | 15 Yes | 2 No |
Critical Path Method is...
How is calculate the cube molt
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
What is the amount of cement,sand and course aggregate(jully)(in kgs) required for the RCC of an area of 450 square feet and 5 inch depth if the concrete mixing ratio is 1:2:4(cement:sand:jully)?your answer will be very helpful.
why building got air crack? if it get in one particular are what is means?
what are the types of bricks? & what is strength of this type?
What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building) area of RCC?
different type of formwork?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
Why I-section is preferred to channel section?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
How can calculate cement quantity in brick work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)