What is the difference between EPC,DBOOT and BOOT.
Answers were Sorted based on User's Feedback
Answer / nkn
These are the terms used in contracts, EPC - Engineering ,
Procurement , Construction; BOOT- build Own Operate
Transfer; DBOOT - Design Build Own Operate Transfer.
Is This Answer Correct ? | 22 Yes | 3 No |
In the EPC system, funds will be provided by the client
based on the client's estimation.The contractor has to
execute the project as per the scope of the client. In the
BOOT, the funds shall be of contractor's and based on
project viability, the contractor can collect fee from the
users for a specified period to get back his funds.
Wherein, the designs will be specified by the client. In
the DBOOT, contactor can do value engineering based on the
scope of the project and can get back his investment as in
the case of BOOT.
Is This Answer Correct ? | 15 Yes | 2 No |
what is mean by quality in terms of construction
WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
What is fineness modulus ? and its sieve # ?
How many types of rcc slab
What is Pavement & carrage way?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
19 Answers DNA Infrastructure, HCC, L&T,
What is the calculation for finding cement and sand for 10' * 12' area ratio 1:6 thickness 12 mm
WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC
7 Answers Omaxe, Shoba Devlopers,
how to calculate upthrust pressure of under ground water tank in wet soil?
how much 20 mm metal is used in M25 grade desin mix in weight and sand for 1 cubic metre
reinforcement lapping for short pile and long pile