How can u prepare mix design for concrete?
Answers were Sorted based on User's Feedback
Answer / md murtuza ali
concrete mix are of many types ,generally for domestic construction we use M20 grade of concrete where 'M' is the mix
of ingredients such as cement, agrregates(fine and coarse) and water and '20'refers to compressive strength of concrete for 28 days of curing with water.
steps invovlved in concrete mix are
1)collecting raw materials such as cement (43 grade or 53 grade),fine agrregate(sand)and coarse aggregate(gravel or stone)
2)batching:-weighing of all the raw materials the ratio of M20 grade of concrete should be (1:1.5:3) which means 1 part of cement,one and half part of sand and three parts of gravel with water by water cement ratio.
3)the water cement ratio should be 0.45 of all mix
4)mix the all ingredients such as cement ,affregates and water.
5)after mixing the freshly mixed concrete should be used for its application .the initial setting time of concrete is 30 mins and final setting time sholud be less than 10 hrs.
so this was about the mix design for M20 concrete.
Is This Answer Correct ? | 42 Yes | 8 No |
what is the meaning of degreasing of the euipment or line.
What will you do if a portion of load bearing wall collapses under your supervision?
How to find arc area with using angle?with out using angle?
What is bylayer?
Sir your company in receiver ment of civil engineering.
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
what is civil engineering?
2 Answers CPWD, drda, Jal Nigam, NHPC, Uttar Pradesh Jal Nigam,
What is the mixing ratio of M7.5,m10,M30,m35&m40?
15 Answers Reliance, Umiya Construction,
In 120 m high RCC Chimney shell construction how we can calculate the inner and outer dia of shell at every +1 m level as this shell is inclined from bottom to top.
What is labour ratio for construction of residential buildings
in design case of structural member best suitrable percentage of steel limit is what
what is the least count of staff ?