manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm
and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
No Answer is Posted For this Question
Be the First to Post Answer
What is reinforced concrete?
Which percentage of carpet area use in plot area of office building.
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
How to calculate Cement, Sand and Kapachi required for M20, M25
What is Architect-Prepared Contract?
What are the main reasons for conducting pull-out tests for soil nails?
Who built the sears tower?
for 1sft of Cement plastering ratio 1:3 How much quantity of cement and sand required.?
2 Answers CGL, URC Construction,
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
How much steel needed for 1 m3 concrete for slab?
what is pmc(in rigid pavement)
what interested you in becoming a civil engineer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)