Answer / nadim shaikh
depends upon the material by which the filling is needed
| Is This Answer Correct ? | 0 Yes | 0 No |
backfilling is 1/3 rd of the excavated qnty.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
| Is This Answer Correct ? | 1 Yes | 5 No |
how to know the one way or two slab
3 Answers ASC, Harmal Enterprises,
What is the density of Cement, Fly ash,20 mm aggregate, 10 mm aggregate and stone dust?
14 Answers Amrapali, Egis, Himuda, Indramas, L&T,
Water cement mixing in hopper less mixture machine is better than hopper mixture machine because:
How many types of stirrups are there? How to calculate their cut lengths?
we do not provide reinforcement bar through the centre of a column.why?
what is the proedure to do soundness test in cement? What is the maening of soundness? Why we do it for cement?
Explain your project management?
2 Answers HNB Engineers, Shell,
Define what is quality...
How many types of Pile Foundation?
A person feels comfort when downs a stair because of ––
How many cncrete grades are used for construction,explain with proportion,grades and where it used
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)