Answer / mohd ameen

1m3 compacted = 1.8m3 dry excavated.

Is This Answer Correct ?    12 Yes 3 No

extra how much quantity need to fill the actual excavated quantity...

Answer / nadim shaikh

depends upon the material by which the filling is needed

Is This Answer Correct ?    0 Yes 0 No

extra how much quantity need to fill the actual excavated quantity...

Answer / partha mitra

backfilling is 1/3 rd of the excavated qnty.

Is This Answer Correct ?    0 Yes 2 No

extra how much quantity need to fill the actual excavated quantity...

Answer / sjtbehera

actual excavated qty minus RCC qty plus PCC qty of the
structure.

Is This Answer Correct ?    1 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

how much shouid be the rate for ready mix concrete per cubic meter

0 Answers  


How to calculate cut length in ring of circular column?

3 Answers  


What is missing report and how to prepare

0 Answers  


Anyone have sample questions for bhel please send me since Iam appearing for this exam. Kindly send this to my e-mail: nethaj_babu@yahoo.co.in

4 Answers   Bhel,


What is difference between MS and Tor steel ?? Please ellobrate...or state its charactersitcs??

4 Answers   CLG, Indiabulls, TOR,






IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS

12 Answers  


can i place column steel lapping in floor beam? my lapping is 24 inches in floor beam and 24 inches on floor beam

1 Answers  


what is the logical concrete mix design for M 30 Grade and the cement consumption per M3

7 Answers  


how to take quantity in triangle section for calculating tender purpose

1 Answers  


mean of NH4 pipe

0 Answers   GVK, L&T,


What is the density of Cement, Fly ash,20 mm aggregate, 10 mm aggregate and stone dust?

14 Answers   Amrapali, Egis, Himuda, Indramas, L&T,


Is there any alternate for plastering

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)