extra how much quantity need to fill the actual excavated
quantity.
Answers were Sorted based on User's Feedback
Answer / nadim shaikh
depends upon the material by which the filling is needed
| Is This Answer Correct ? | 0 Yes | 0 No |
backfilling is 1/3 rd of the excavated qnty.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
| Is This Answer Correct ? | 1 Yes | 5 No |
How to calculate quantity of plum masonry in 1:3:7
Please explain soil invistigation methods?
What year was the keystone power plant in Indiana County constructed?
what is the meaning of laitance
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
how many cement use for 1cum concrete for 25Grade.
how to calculate the size of triangular ring in rcc column?
1 Answers Prime Perfect Buildcon,
One unit equal to how many brick
3 Answers Sainath Infrastructure,
what interested you in becoming a civil engineer?
what is the unit of heat of hydration?
give me the rate analysis for Bituminous Macadam and SDBC
23. If you had enough money to retire right now, would you?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)