extra how much quantity need to fill the actual excavated
quantity.
Answers were Sorted based on User's Feedback
Answer / nadim shaikh
depends upon the material by which the filling is needed
Is This Answer Correct ? | 0 Yes | 0 No |
backfilling is 1/3 rd of the excavated qnty.
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
Is This Answer Correct ? | 1 Yes | 5 No |
how much shouid be the rate for ready mix concrete per cubic meter
How to calculate cut length in ring of circular column?
What is missing report and how to prepare
Anyone have sample questions for bhel please send me since Iam appearing for this exam. Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
What is difference between MS and Tor steel ?? Please ellobrate...or state its charactersitcs??
4 Answers CLG, Indiabulls, TOR,
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
can i place column steel lapping in floor beam? my lapping is 24 inches in floor beam and 24 inches on floor beam
what is the logical concrete mix design for M 30 Grade and the cement consumption per M3
how to take quantity in triangle section for calculating tender purpose
mean of NH4 pipe
What is the density of Cement, Fly ash,20 mm aggregate, 10 mm aggregate and stone dust?
14 Answers Amrapali, Egis, Himuda, Indramas, L&T,
Is there any alternate for plastering