extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / partha mitra
backfilling is 1/3 rd of the excavated qnty.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
How can we convert weight batch to volume batch for m30 mix
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
What is pre-stressed concrete?
what are the values of compressieve strenght?
at which depth the construction of tunnel is economical from cost and engineering aspect.
400 ku d/c clearess ketan hota hai?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How to calculate steel for beam slab and column
How do you calculate the unit weight of concrete?
Explain what is structural frames or systems?
How many kilo-newtons equals 1000 kilogram?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
pile load testing procedure
Define relative co-ordinates?