extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / partha mitra
backfilling is 1/3 rd of the excavated qnty.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is your role of in previous company as a construction manager
What is the strongest bridge for a school contest?
what is Short bored pile foundation.
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Explain what is the release of lien?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
how can we calculate steel value, depending on load
1:4:8 pcc calculation 591 cu.ft
What is rate of concrete surface rendering work per sqm
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
please briefly explain calculating or estimating steel quantity for a RCC column?
What do you mean by the word 'shear'?
how to control PQI (Project Quality Index)
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.