Answer / sfz ans
M20 (1: 1.5: 3)
Wet mix = (Dry mix)x 1.52 ie: 52% more
Cement = [ 1/(1+1.5+3) ]x 1.52 = 0.2763cum
ie: 0.2763cum/1cum conc
ie: 0.2763cum/35.25cft conc
ie: 0.00783 cum/cft conc
ie: (0.00783/.0347)bags = 0.2258 bags = 0.2258 x 50 = 11.29kg
Therefore
Sand = 11.29 x 1.5 = 16.941 kg
Agg = 11.29 x 3 = 33.87 kg
Note: But Concrete is always estimated in cubic meters.
| Is This Answer Correct ? | 14 Yes | 3 No |
Answer / madhusudhan reddy
1.25 CFT = 50 KG = 1.0 BAG OF CEMENT
1.00 CFT = 40 KG = 0.8 BAG OF CEMENT
| Is This Answer Correct ? | 13 Yes | 6 No |
Answer / sfz ans
http://theconstructor.org/practical-guide/estimated-quantities-of-materials-required-per-cubic-metre-of-compacted-mortar-or-concrete/1304/
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / sumit
for 1 cubic meter (1:1.5:3)
1/1:1.5:3*1.52*28.8=6.4bags of cement
sand 6.4 *50*1.5= 480 cu ft
agg 6.4*50*3=960kg
| Is This Answer Correct ? | 3 Yes | 2 No |
Ratio for concrete M20 equal is 1,1,2
Total volume equal is 1cft
Concrete dry volume equal is 1.52
Cement bags= 1/4*28.8*0.028*1.52 equal is 0.306 bags
= 15.32 kg cements
Sand equal is 1/4*0.028*1.52 equal is 0.170 Cum
= 0.375 cft sand
Agregats equal is 2/4*0.028*1.52 equal is 0.021 Cum
= 0.751 cft agregats
| Is This Answer Correct ? | 3 Yes | 7 No |
Respected sir i am appearing for the exam this year.I will be highly obliged if u kindly send me last year's interview paper on civil engineering in my email address debosmitroy@yahoo.in
Formula for calculation volume of essentric footing
What will be the crank length in an staircase is same like an slab?
Fly ash is residue generate from??
What is the difference between routing maintenance and major maintenance in school facilities?
How will you provide reinforcement from corrosion?
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
how to caliculate required amount of cement and sand required for 1cu.m.
Civil engineering related
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
1:4:8 pcc calculation 591 cu.ft
iam constructing a new hall of size 21'*14'. we r constructing without columns...i.e only with basement..and constrcting wall thickness of 9" only...can I laid slab on these walls? is it safe?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)