extra how much quantity need to fill the actual excavated
quantity.

Answer Posted / mohd ameen

1m3 compacted = 1.8m3 dry excavated.

Is This Answer Correct ?    12 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the purpose of the gap in the road on this bridge?

695


how to design and calculate materail quantity for concrete speedbreaker ?

5377


How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1460


What was asked in isro civil interview

499


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1656






what is civil enginnering & what you need of this course?

1797


What is the significance of cost estimate knowledge for an architect?

1148


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

1893


at what pressure ply-wood is obtained by gluing wooden sheets

2097


please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

1151


Test procedure of fly ash bricks as per code ?

2126


Why we provide hair pin for shed

1915


how to absorb to site basic corrections? which are the important correction?

995


Define polar co ordinates.

706


which steel is better for residential building tmt steel or hysd steel

1769