extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
Basic questions of civil engineering
to minimize budget cost of building , what can i do
from where ican get sample papers for CET-delhi 2012
how calculate the bearing from two coordinates?
What will you do if a portion of load bearing wall collapses under your supervision?
Dear Sir What is the Contraction joint for base Slab
what radial pressure, the NP2 class rcc pipe can sustain?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
How we calculate the service time of buildings
what is the difference between tsp & tower
how we check the thickness and line of ceiling plaster.
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How is the strength of cement measured?
What is Architect-Prepared Contract?
what is the hanekom repairing material after concreting work