What are the test involved in DG auto synchronizing panel
before in manufacturing place before dispatch.

Answer Posted / engineered

DG auto synchronising panel are equiped with Numerical
series relays,
At manufacturing facility grid power is used for
synchronisation purpose.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir i had plane to do some project with the base of hopkinson test in AC supply its possible

1355


What is the use of oil in transformers?

624


what happen if the supply is given to the stator of the 3phase induction motor with out assembling the rotor ?

1478


why we r not earthed Control cable of C.T. terminals

1539


What will be the effect if I use inverter as UPS mood?

1745






PLEASE ANYBODY HAVE ELECTRICAL CIRCUIT DIAGRAM FOR CHMER PULSE CD 60M SPARKING MACHINE.PLEASE MAIL ME SUPRIYAAYYAPPAN@YAHOO.CO.IN.

2339


how to calculate IR value of 33KV cable ??

1329


exolain the star delta connection

2180


HOW TO CALCULATE ELECTRICAL, MECHANICAL,& OVERALL EFICIENCY OF GAS ENGINE POWER PLANT

1522


What are the two segments of nyquist contour.

644


What is the gross weight to copper ratio in slip ring induction motor of 4000 HP,6.6 kv, 372amp, 992 rpm GE motor.

1905


Inverter. converter. Ups.MCB.solar.alternators. motors.

1379


Under wat condition statcom operates as an inductor for the transmission line?

1425


For high frequency application we use which transformer?

1342


i need list of swg(standard wire guage) or area of conductor v/s current carrying capacity of conductor copper & alluminium...

1381