What are the test involved in DG auto synchronizing panel
before in manufacturing place before dispatch.
Answer Posted / sachin
Generally a DG manufacturer have facility of load testing
at there end. While testing auto synchronisation ,
protective relaying like Reverse power , Ground Fault ,
Short ckt , voltage unbalnce etc test can be carried out.
For synchrinisation test grid power & DG power can be used.
other regular test can also be carried out at manufacturing
stage also.
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is bridge rectifier and explain with details
What is the practical way to calculate the cable size for known ampere load?
Explain dc generator with its types?
how power trnafor from 1 point to another point in bus bar ya transmission line( voltage trnasfer from 1 point to another poin)
Currently what is the highest capacity (MVA) of SPPg generator available in the market?
we have 3 single phase transformers. how will we generate 6 supply from 3 phase supply input
What is meant by coupling capacitor?
How PSV sizing being done
how single phase preventer works ?
Explain how you can give the overload setting to any Motor Protection Relay for a HT motors with formula and example?
Can we use a absolute encoder to show rpm of a motor ? what about the condition when power is off ? what is difference if a incremental one is used ?abanirout@gmail.com
-What should be minimum value of insulation resistance and maximum value of earth resistance at any electrical instillation and what is method of testing the same.
block diagram of 2 ups system connected in hot stand by mode?
WHat is the general checks required for Dry type transformers
-What shall be short circuit current of LV switchgear for a 1000 kva, 11.415kv, 3 phase tranformer with 5% reactance.