Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why+ve is earthed in electrostatic precipitator in thermal
power plant


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

WHAT IS MINIMUM AMOUNT OF CURRENT THE HUMAN BEING CANT RECOVER FROM THE SHOCK,WHAT IS THE RESISTANCE OF THE HUMAN BODY

3 Answers  


what is Distance protection & how did it work

2 Answers  


I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in

0 Answers  


IN THE CASE OF AN ELCB, IF THERE IS ANY UNSTABILITY BETWEEN PHASE AND NEUTRAL IT MAY TRIP. BUT MY QUESTION IS WHEN A LOAD IS CONNECTED IN BETWEEN P AND N, THE LOAD CONSUMES SOME POWER AND THERE IS A DIFFERENCE IN NEUTRAL WITH RESPECT TO THE PHASE. THUS ACCORDING TO ME, THE ELCB WILL AUTOMATICALLY OPERATES WHEN EVER THE LOAD CONSUMES-- I KNOW IT IS WRONG. BUT THE SOLUTION IS?????????

1 Answers   KSEB,


What are the functions of different probes used in cro?

0 Answers  


why do we lay up the core of a cable?

0 Answers  


The insulation resistance of a cable can be measured by

3 Answers  


Actually why the transformers ate rated in KVA.?

2 Answers   Torrent Pharma, XYZ,


What type of DC Generator is used for Arc Welding purposes?

7 Answers   CPCL, Rubicon,


Motor also having losses, we call KW rating. In transformer and generator having losses but we call KVA Rating why?

9 Answers  


WHY MOSTLY Rph IS USED FOR CONTROL CIRCUITS AUX. SUPPLY ?

0 Answers   UltraTech,


As we know,charged clouds(from which lightning stroke initiates)may be charged with either +ve charge or -ve charge. Now say one cluster of cloude is fully charged with +ve charge & another cluster is fully charged with -ve charge. In the sky these two cluster of charged clouds have come in such a distance that, if they come clouser by some few yeards then the lightning discharge will take place between these two cluster of clouds. Under such a situation an Aircraft came inbetween. what happend??

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)