Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is Hi-Pot Test for Grid Station HV Equipments?

Answers were Sorted based on User's Feedback



What is Hi-Pot Test for Grid Station HV Equipments?..

Answer / naresh chandra jha

Hi-pot test is used to check the leakage current of HT
breaker , Ht bus bar,HT cable .In this test (3v+1)80%
voltage is applied in one phase and leakage current is
measure in other two phase(which is shorted )with the help
of multimeter ,which is connected in hipot kit .In hipot
test ,voltage is step up with the help of auto
transformer(variac) and hipot kit. this hi voltage(AC
voltage for breaker ,bus bar and DC voltage for cable )is
applied in phase. DC voltage is created with the help of
diode which is connected in series with AC voltage(hipot kit) .

Is This Answer Correct ?    4 Yes 0 No

What is Hi-Pot Test for Grid Station HV Equipments?..

Answer / shao

Thank you so much Naresh!

But i think we only measure the respective leakage current at that phase on which we have applied voltage.?
e-g; Applied 40KV at Red phase for 60sec, & measured leakage current was 0.6micro Amperes.

Actually im seeing this testing at a 132KV Grid Station.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what are upstream faults and downstream faults in power system

2 Answers   Sreetech,


how can we convert 48V dc into 12 V dc? Any standard device for it??

2 Answers  


What is servo lock in CNC how they work and if any parameter for them in CNC machine

0 Answers  


what is the relationship between horse power and watts

9 Answers  


A motor works on 30kw.it is working on 440volts.How much amper will be Required?

7 Answers  


why we maintain 50hz ,220volts,20Amp,ratings fixed every where in india,,electricity

1 Answers  


What is basic impulse insulation level? And how it is calculated for sub- station?

2 Answers  


how do u gauge the size of the cable ?for eg. consider a 300 sqmm L.T Cable.How do u determine the size of the cable seeing it pratically?

0 Answers   Bhel, Jai Balaji, Rashmi Group,


give me list of material for wiring of 20hp motor?

2 Answers   Alchemist,


what is the maintain in ACB,VCB,MCB,MCCB breakers?

4 Answers   CTS,


what is the difference between OD and VL

1 Answers   Bescom,


In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)