Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is Hi-Pot Test for Grid Station HV Equipments?

Answer Posted / shao

Thank you so much Naresh!

But i think we only measure the respective leakage current at that phase on which we have applied voltage.?
e-g; Applied 40KV at Red phase for 60sec, & measured leakage current was 0.6micro Amperes.

Actually im seeing this testing at a 132KV Grid Station.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Load break swicth maintenance procedure.

1821


What is the voltage gain or transfer function of amplifier?

1181


HOW WE CHOOSE EARTH'S POTENTIAL AS ZERO V?

2114


According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

2026


how can i reduce sparking without stepdowning the voltage

2571


Can 4pole (3 phase+neautral )RCCB proper functioning in only 3 phase load (no neautral, no Earth) ?

2199


HOW TO CALCULATE EARTHING SIZING?

2243


Can i use the B-curve MCB instead of C-curve MCB

2081


What are the components of feedback control system?

1146


How to test the vector group of a Yd11 transformer? what are the relations to be checked between various vectors to confirm this vector group?

4529


how we can adjust for three phase motor cold stall time ,hot stall time and thermal register set up?

2925


how 650 volts creates? where is use?

2254


what is RNG in the DG synchronizing by PLC?

2177


Why efficiency of generator is higher than motor at a particular load?

2131


our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.

2146