In both 600/1000 V cable and 450/750 V cable, we can supply 415 V. However for distribution, all utilities are using only 600/100 V instead of 450/750 V. What is the reason?
No Answer is Posted For this Question
Be the First to Post Answer
What is the classification of hydro projects based on installed capacity?
what are the types of basic earthing?and why we are doing that?
How can we deside Short Ckt level of electrical System,Breakers etc.please provide formula to find SC of HV side & LV side
Ratings of power transformer,Distribution transformer.
how to decide the panel size like MDB ,SMDB PANEL SIZES
how can we can take BDV test in transformer?
Why it is necessary to isolate fire fighting when you are taking shutdown for lv board.
What is the difference between power,voltage,current? and with example
how the 6.6KV motor can be used with 11KV?
what will be the motor terminal box connection arrangement (star or delta). on what basis it decided?
We know that primary transmission is done to reduce current so that i^2*r loss could be minimised but according to ohm's law v is directly proportional to i,which indirectly means higher potential difference means larger current?so how the current is minimised in high power transmission line??
what is bus pt and what is the function of it ???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)