Answer / amjad chaudhary
1 bag of cement=1 farma=1.25 cft=0.0354 cum
so for 1 cum=1/0.0354
=28.25 bags,say 29 bags
Is This Answer Correct ? | 29 Yes | 5 No |
Answer / ajay prasad
The density of cement-1440kg/m3
So no. of cement bags-1440/50 (Because 1 bag = 50 kg cement)
- 28.8 Bags
Is This Answer Correct ? | 24 Yes | 2 No |
for the one meter cube 28.8 bags are required.
Is This Answer Correct ? | 14 Yes | 2 No |
Answer / fathi abu sabha
1.5 ton/m3 = 1500 kg/ m3
volume = mass/density = 50 kg ber bag /1500 kg/cm3= .03333
volume for cement bag = 0.03333
in empty container = 1/0.03333 = 30 bag
Is This Answer Correct ? | 16 Yes | 6 No |
28.8 begs are required to fill the 1m3 of empty container.
Is This Answer Correct ? | 7 Yes | 1 No |
1440 Kg/m3 volume = mass/density = 50 kg ber bag /1440
kg/cm3= 0.0347
volume for cement bag = 0.0347
in empty container = 1/0.0347 = 28.80 bags
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / kk thomas
Cement bags only, not cement
Approx. 2000nos of bags (50kg cement polythene bags)
Is This Answer Correct ? | 3 Yes | 9 No |
What is binding spacing of the rebars at lapping zones.
how to find the quantity of materials required for constructing a wall of length 10*5*.2m?
Why we take 162.2 in (d*d/162.2) to calculate weight of steel???
Engineering method, why need is column kiker??? what is necessity??
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what are the differences between Tie beam, Ground beam and strap beam. thanks
what are the criteria for choosing the span for the bridge (highway bridge)
indian standard split spoon sampler
how to check and keep control on the wastage of material at site
0 Answers Aashray Design Consultants, ABC Infra, Jain Group,
Explain what are the problems one might face while having a Cantilever balcony?
What is the Compressive strength of concrete C40/20 at 7days
what are the duties of Site Engineer in work site?
0 Answers Amarprakash Developers,