What is Refuse Area In High Rise Building ?
No Answer is Posted For this Question
Be the First to Post Answer
Please design 12.5m long dubbly beam
0 Answers Aarya Construction Design,
why we create short columns under grade slab?
200sq.ft of slab and thickness is 6" in that how much cement are required(bags), sand & aggregates are in cu.m, choose grade of concrete is m20.
How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
How to calculate the length of chairs provided to support the top rebar in concrete foundation
mix proportion of M20 AND what are different grades below it
6 Answers B L Kashyap, L&T, Panchshil Infrastructure,
What is the difference between tor steel and tmt steel?
What is factor not to be taken in consideration in mix design?
What is the l/d ratio of cantilever beam?
What is the difference between auto & dumpy level
Which type of plywood & sizes using in construction projects ?