how much quantity of cement bags are required to fill the
one m3 of empty container.?

Answer Posted / kk thomas

Cement bags only, not cement

Approx. 2000nos of bags (50kg cement polythene bags)

Is This Answer Correct ?    3 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the types of surveying?which type of survey carrying for type of work?

1675


Why Vitrified tile are getting pop up.

529


Stringer How many cm goes to landind

1204


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

1663


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1886






Pls provide me with the calculation or codes related to de- shuttering of flat slabs

5914


How to make a c++ program that converts any base to base 10?

1619


What is M40 _ TOR - EQ and B.F.S

2021


How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

5815


A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

1773


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

1518


what is cement wastage percentage in NHAI ROAD WORKS

1425


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1561


How to come 1.54 from dry to wet concrete? 

1815


Write short note on construction programme for pile foundation.

4968