what will do when 7days concrete has failed and structure has
constructed?
Answers were Sorted based on User's Feedback
Answer / modipraveen
Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.
| Is This Answer Correct ? | 19 Yes | 1 No |
If 7 days result not getting,wait for 28 days.if 28 days
result not achived that perticular Quantity part breakdawn.
in any doubt with cube testing result we can also doing
core cutter test or rebound hammer test for at the 07 days
& 28 days sharp time period
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / suresh bariya
Generally we will wait for 28th day test,if 28 days test
result get failed then immidiate inform your structural
consultant,consultant will suggest the rebound hammer test
which is not a perfect solution, then do the core cutting
test it will give you the actual result of that strucutural
concrete, from this result you will know the actual
strength ,it will decide the jacketing will serve the
purpose or brecking is the final solution.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / amilineni s babu
we have to wait for 28 days strength if it is also less we
have to go for core cutting or rebound hammer tests for that
particular structure part.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / karnam seenu
,When a cube test conducted for a structural member fails, it is advisable to go immediately for a core cutting test and send the sample slab core to test the compressive strength. You need not wait for 14 days or 28 days.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the density of concrete & steel? where we are using pycnometer? what is bulking of sand? what is under reinforced & over reinforced? what is balanced section?
what is the process of repair the structure in whitch reinforcement is open
how to identify different types of soils in field?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
What are the advantages of Prestressed Concrete
how we can design the design mix(m25)
what is the mix design for M:60 with micro silica andmetakaoline?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
How much steel required in one cubic meter RCC Main girder
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?
What is a bearing capacity of soil?
Till how many days can we keep a cement bag without using? And on what conditions the cement will get spoiled?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)